Before each shift, review the previous handover and check whether the scrubber is ready to use. After use, complete the required after-use tasks and any daily care assigned to your shift, then record issues that need follow-up. The checklist below shows how to capture these steps for a Sheen L350B.
Daily Floor Scrubber Maintenance Checklist (L350B Example)
The L350B manual calls for recovery-tank emptying and brush care after operation. It lists recovery-tank and filter cleaning and squeegee care under daily maintenance. A site running multiple shifts should assign that daily cleaning to a specific shift; “daily” does not mean repeating it after every use.
Machine and shift record: Model/configuration ______ · Machine ID ______ · Date ______ · Shift ______ · Operator ______
Assignment for daily maintenance tasks only: Shift ______ · Responsible person ______. Use “Not due this shift” only when the daily task is assigned to another shift.
| Stage / frequency | Item | Check or action | Result / follow-up |
|---|---|---|---|
| Before each shift | Previous handover | Read open issues and confirm who is responsible for the next check. | ☐ Clear ☐ Follow-up needed · Details ______ |
| Before each shift | Visible machine condition | Look for leaks, damage, or loose parts; check any connected charger or cable for visible damage. | ☐ Clear ☐ Issue · Details ______ |
| Before each shift | Brush and water-recovery parts | Check the visible brush, squeegee, and connections for damage, obstruction, or loose fittings. | ☐ Clear ☐ Issue · Details ______ |
| Before each shift | Battery charge and indicators | Check charge for the planned task and note any low-charge, warning, or fault indication. | Charge for task: ☐ Sufficient ☐ Insufficient ☐ Unclear · Warning/fault: ☐ None ☐ Shown · Details/action ______ |
| After each use | Recovery tank | Switch off; move to the designated wastewater handling area; empty the tank by the approved procedure. | ☐ Done ☐ Pending · Details ______ |
| After each use | Brush | Clean and rinse as directed by the current L350B instructions and within the operator’s training; record any unresolved condition. | ☐ Done ☐ Pending · Details ______ |
| After each use | New operating issues | Record any new symptom, trapped debris, or water-recovery problem. Carry unresolved items into the handover record. | ☐ No new issue ☐ Issue recorded · Details ______ |
| Daily — assigned shift | Recovery tank and filter | Clean the tank and filter as directed by the current L350B manual. | ☐ Done ☐ Pending ☐ Not due this shift |
| Daily — assigned shift | Squeegee | Clean and inspect it as directed by the current manual; record damage or wear needing attention. | ☐ Done ☐ Pending ☐ Not due this shift |
At shift handover — suggested record: Adapt the status labels and release fields to the site’s procedure; they are not L350B manual-defined categories.
- Issue, location, and time observed: ____________________
- Action taken and person responsible: ____________________
- Remaining action and assigned person: ____________________
- Parked at: ____________________ · Charging status: ☐ Charging ☐ Charging complete ☐ No charge scheduled ☐ Charging check needed
- Status for the next shift: ☐ Ready for use ☐ Correct before use ☐ Hold pending review
- Next-shift check — name/time/result: ____________________
- Release confirmation, where required by site procedure: ____________________
Before Each Shift: Review the Handover and Check Readiness

Read the previous shift’s handover before using the L350B. Check any unfinished task or reported fault and follow the recorded next action. If the machine is on hold, leave it unused until an authorized person clears it under your site’s procedures; its appearance alone does not show that the issue is resolved.
For the wider before, during, and after sequence, see the floor scrubber use guide; keep this checklist tied to the L350B instructions.
Walk around the machine. Look for leaks or visible damage around the tanks, hoses, and connections. Check the brush and squeegee for trapped debris, wear, or loose parts. Check the battery charge against the planned task and note any warning indication shown on the machine. Inspect the charger and cable when they are connected or about to be used.
If your training and the L350B instructions permit you to clear accessible debris, do so and check the area again. Record and report leaks, damaged charging equipment, unusual odors, or abnormal control response. Do not start or resume use while an issue requiring review remains open.
After Use: Empty the Recovery Tank and Complete Required Cleaning

After use, switch off the L350B, move it to the site’s designated wastewater handling area, and empty the recovery tank in the order described by the manual. Wear gloves for this work and follow the site’s approved disposal procedure. If the correct way to handle the wastewater is unclear, confirm it before draining.
Clean and rinse the brush after use as directed by the current L350B instructions and within your training. Recovery-tank and filter cleaning, along with care of the squeegee assembly, are separate daily maintenance tasks. If the machine is shared across shifts, agree which shift completes and records that cleaning. Emptying the tank alone does not mean the filter has been cleaned.
For background on why tanks, squeegees, and suction hoses need regular care, see this machine-care guide; keep the task frequency tied to the current L350B manual.
If water pickup is weak or the scrubber leaves water behind, record the symptom and check only accessible areas within your training. The L350B manual calls for a suction-pipe check weekly or when pickup is poor. It also warns against flushing the pipe between the vacuum motor and recovery tank. Leave hose disassembly and internal repairs to personnel trained and authorized for those tasks.
Inspect Working Parts, Then Park and Check Charging Status

After the required brush care and any squeegee cleaning due that day, check the brush and squeegee for trapped debris, worn bristles, and torn or deformed squeegee rubber. Check the visible squeegee mounting and suction-hose connections for looseness.
Record parts that need adjustment or replacement, and use the parts checklist when planning a separate order. Remove or adjust components only when the current L350B instructions and your training permit it.
Park the machine in the designated area. If your site tracks machine locations, record where it is parked. Record one of four charging statuses: Charging, Charging complete, No charge scheduled, or Charging check needed. Confirm which battery is installed in this L350B and use a charger suited to that pack. Follow the instructions for that battery and charger; charging is not automatically required after every shift. For shift planning across battery configurations, see the battery runtime and charging guide.
If a charger or cable is damaged, do not use that charging equipment. Report the issue and mark the charging status as Charging check needed until the equipment is checked. Whether the scrubber itself may be used is a separate decision under the site’s procedure.
Hand Over a Clear Machine Status, Not Just a Ticked Box

For any open issue, write a handover note that tells the next operator what still needs attention and who is responsible.
The three status labels in this checklist are examples; use your site’s own labels and release rules. Ready for use means the required checks are complete and no unresolved issue prevents use. Correct before use means a specified action and recheck are needed before the next task. Hold pending review means the machine remains unused until an authorized person assesses it. A ticked box alone does not confirm clearance.
At the start of the next shift, review open items, record the recheck result, and obtain any required release confirmation. Promptly report faults affecting safety, operation, or water pickup. Only personnel authorized under site procedures should decide on repairs or clear the machine for use.
Keep Weekly Maintenance Separate From the Daily Checklist
Keep the daily checklist focused on checks before each shift, actions after each use, and daily tasks assigned to a shift. The L350B manual lists the suction-pipe check and solution-tank cleaning under weekly maintenance. For planning, record their due dates, completion, and responsible person in a separate maintenance log instead of repeating them on every shift’s checklist.
Operators should carry out only the checks and cleaning allowed by the current L350B instructions and their training. Refer disassembly outside the operator’s training, electrical diagnosis, and repairs to qualified maintenance personnel. If poor water pickup or another fault appears before the next scheduled check, report it promptly rather than waiting for the planned maintenance date.
Conclusion
Before using this checklist on site, confirm that its tasks and frequencies match the current instructions for your L350B configuration, and adapt the status labels and release fields to your site procedures. For a different machine, find its model in the floor scrubber range and build its checklist from that model’s instructions.
For model-specific manuals, compatible consumables, or maintenance information, contact Sheen with the machine’s model and configuration.